How it works

How to get a good estimate

  1. Choose the concrete shape or Stone / gravel calculator.
  2. Measure the dimensions and enter them in the units shown.
  3. Choose an allowance for uneven ground, spillage, and measurement uncertainty.
  4. Use the result as a planning number, then confirm the order with your ready-mix supplier.

How are concrete and stone quantities calculated?

Slabs: length × width × thickness, converted to cubic feet. Rectangular footings: length × width × depth. Round columns: π × radius² × height, multiplied by the number of columns. Stone / gravel: area length × area width × depth, then converted to cubic yards and estimated tons using the selected tons-per-yard assumption. Cubic feet are divided by 27 to convert to cubic yards.

Concrete bag counts are rough equivalents based on typical nominal yields (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³). Stone tonnage is approximate: the actual tons per cubic yard depend on aggregate type, gradation, and moisture. Confirm with your local supplier.

💡
Stuck? We got you.

Check the product label and double-check your measurements before buying. We do math; we do not bend the laws of physics.